欢迎来到财会考试题库网 财会考试题库官网
logo
全部科目 > 微软认证考试 > MCSE > MCSE(70-290)

单项选择题

You have a server that runs Windows Server 2003 Service Pack 2 (SP2). The server has a backup tape drive installed.
You need to schedule a backup to tape. The tape must be ejected when the backup job is complete.
Which commands should you include in the scheduled task? ()

    A. Devcon.exe and Poolmon.exe
    B. Ntbackup.exe and Devcon.exe
    C. Ntbackup.exe and Rsm.exe
    D. Rsm.exe and Poolmon.exe

点击查看答案&解析
微信小程序免费搜题
微信扫一扫,加关注免费搜题

微信扫一扫,加关注免费搜题