单项选择题
All the damage and shortage,()those incurred after discharge and before delivery to receivers,should be noted in the discharging report.
A.including
B.besides
C.except
D.in addition to
点击查看答案&解析
相关考题
-
单项选择题
A sling is a device used in().
A.hoisting cargo aboard a vessel
B.hoisting personnel aboard a vessel
C.securing a small boat to a large vessel
D.hoisting the anchor -
单项选择题
A large basin cut into the shore,closed off by a caisson,and used for drydocking of ships is known as a().
A.slipway
B.graving dock
C.ground warp
D.caisson dock -
单项选择题
Which action will affect the trim of a vessel? ()
A.Moving high weights lower
B.Adding weight at the tipping center
C.Moving a weight forward
D.Moving lower weight high
