单项选择题
During which phase is a proposal developed and delivered? ()
A.Prepare
B.Plan
C.Design
D.Operate
相关考题
-
单项选择题
What will happen if you issue the redundancy force-switchover command on a Catalyst 6500 SeriesSwitch with redundant supervisor modules? ()
A. reset of the primary supervisor
B. manual switchover from standby to active supervisor
C. manual switchover from active to standby supervisor
D. automatic switchover from active to standby on primary supervisor failure -
单项选择题
Refer to the exhibit. Which of the following statements is true? ()
A. BGP NSF awareness is enabled
B. SSO for BGP NSF capability is enabled
C. BGP graceful restart awareness is enabled
D. 10.11.1.187 is configured as an NSF-capable BGP neighbor -
单项选择题
Refer to the exhibit. You want to minimize the downtime that results from supervisor engine switchovers on Cisco 6500 Series Switches and Cisco 7600 Series Routers. To achieve this, you are considering deploying a Cisco Nonstop Forwarding with Stateful Switchover solution using OSPF. In the exhibit you can see the output of the show ip ospf neighbor detail command. Which trait of systems using Cisco Nonstop Forwarding with Stateful Switchover and OSPF is shown in the exhibit output and will impact your plan?()
A. Stateful Switchover for Cisco Nonstop Forwarding only works with BGP.
B. Stateful Switchover for Cisco Nonstop Forwarding must be configured on all adjacent routers.
C. Cisco Nonstop Forwarding with Stateful Switchover helper mode is not supported on the adjacent router.
D. Cisco Nonstop Forwarding with Stateful Switchover helper mode for OSPF has been promiscuousstandardized and is supported on the adjacent router.
