单项选择题
Which of these correctly identifies the six phases of the Cisco Lifecycle Services framework? ()
A. Prepare, Plan, Create, Implement, Operate, and Improve
B. Prepare, Plan, Design, Implement, Operate, and Optimize
C. Prepare, Plan, Design, Apply, Operate, and Manage
D. Prepare, Plan, Design, Implement, Operate and Manage
相关考题
-
单项选择题
During which phase is a proposal developed and delivered? ()
A.Prepare
B.Plan
C.Design
D.Operate -
单项选择题
What will happen if you issue the redundancy force-switchover command on a Catalyst 6500 SeriesSwitch with redundant supervisor modules? ()
A. reset of the primary supervisor
B. manual switchover from standby to active supervisor
C. manual switchover from active to standby supervisor
D. automatic switchover from active to standby on primary supervisor failure -
单项选择题
Refer to the exhibit. Which of the following statements is true? ()
A. BGP NSF awareness is enabled
B. SSO for BGP NSF capability is enabled
C. BGP graceful restart awareness is enabled
D. 10.11.1.187 is configured as an NSF-capable BGP neighbor
